Project Profile
Project details
Project: Principal Contractor, Design and Construct
Location: Goulburn
Builder: Precise Air
Client: Snowy Hydro 2.0
Date: 2025
Services: Mechanical services, Fire services, MFE (Mechanical, Fire, Electrical)
At Precise Air, we design and construct solutions that protect critical infrastructure. For Snowy 2.0, we delivered a specialised Climate Control Room to safeguard key equipment.
Snowy 2.0 is a major expansion of the Snowy Hydro Scheme. It will provide on-demand power generation and largescale energy storage, increasing the generation capacity of the Snowy Scheme by almost 50%.
As Principal Contractor, Precise Air delivered the full Design and Construct package for a Climate Control Room that is integral to the operational performance of Snowy 2.0.
This 7,000m² facility plays a critical role in preserving key hydroelectric turbine components until the site is ready to receive them. Our design maintains a strict temperature and humidity of +5 and + 25 degrees, and less than 50% relative humidity to protect equipment integrity.
Building a climate-controlled room inside an existing warehouse in 3 months over the holiday season required meticulous planning, coordination, and approvals.
From securing a Complying Development Certificate (CDC) to obtaining the Occupation Certificate (OC), we worked closely with the Snowy 2.0 team, councils and certifiers to keep the project moving.
Take a moment to watch the video and learn more about this unique and important project in the delivery of the Snowy Hydro 2.0 project.