# 175 Liverpool St

> Precise Air’s construction team completed a NABERS upgrade to this 30 year old building. Our Service team provides preventative maintenance and asset management...

Source: https://www.preciseair.com.au/project/175-liverpool-st-2

Project Profile

# A decade of asset management at 175 Liverpool

Project details

**Project:** Whole of life asset management

**Location:** 175 Liverpool St

**Client:** JLL

**Services:** PPM, Emergency Service, Essential services, Asset Management, Duct / filter cleaning, Client web portal, Eco efficient solutions

![A decade of asset management at 175 Liverpool](https://assets.precisecdn.com/cdn-cgi/image/width=700,height=520,fit=cover,quality=80,format=auto/precise-air-jow-160919-9479.jpg)

One of Sydney’s premier A Grade buildings, 175 Liverpool Street comprises ground floor retail and 28 levels of commercial office space with a net lettable area of 46,423sqm.

Precise Air has been providing HVAC service and energy efficient upgrades to 175 Liverpool St since 2010.

During the design phase, Precise Air’s construction team provide buildability advice to achieve NABERS targets in the most cost-effective way.

This ranges from determining practical modifications to base building to suit the flexible floor plates and tenancy requirements, to the most cost-effective and efficient equipment and BMS.

**As en example, one of our major projects was completed in four stages:**

-   High rise upgrade which including installing new induction units, new VAV boxes and recommissioning of the upper 14 floors
    
-   Low rise upgrade consisting of replacing the multi level AHU with on floor AHUs and perimeter AHUs to the lower 14 floors
    
-   BMS upgrade to the entire building and removal of pneumatic equipment
    
-   Mid rise plant relocation adding in two new floors where the existing mid rise plant was located and relocating all plant to the roof, constructing a new chilled water central plant system and associated works.
    

For more information about Precise Air's design and construction capabilities, contact Alex Hadigol, General Manager Construction.

Share:[](https://www.facebook.com/sharer/sharer.php?u=https%3A%2F%2Fwww.preciseair.com.au%2Fproject%2F175-liverpool-st-2)[](https://www.instagram.com/sharer/sharer.php?u=https%3A%2F%2Fwww.preciseair.com.au%2Fproject%2F175-liverpool-st-2)[](https://twitter.com/intent/tweet?url=https%3A%2F%2Fwww.preciseair.com.au%2Fproject%2F175-liverpool-st-2&text=A%20decade%20of%20asset%20management%20at%20175%20Liverpool)[](https://www.linkedin.com/sharing/share-offsite/?url=https%3A%2F%2Fwww.preciseair.com.au%2Fproject%2F175-liverpool-st-2)[](mailto:?subject=A%20decade%20of%20asset%20management%20at%20175%20Liverpool&body=https%3A%2F%2Fwww.preciseair.com.au%2Fproject%2F175-liverpool-st-2)

[

Previous

Chiller plant replacement in the heart of Brisbane](/project/190-edward-st-brisbane-2)

[Back to all projects](/experience)

[

Next

Energy efficient, low GWP chiller upgrade](/project/14-martin-place)

## Related Projects

[![UVC coil lighting reducing mould](https://assets.precisecdn.com/cdn-cgi/image/width=480,height=300,fit=cover,quality=80,format=auto/UVC-1.jpg)](/project/uvc-coil-lighting-reducing-mould)

### [UVC coil lighting reducing mould](/project/uvc-coil-lighting-reducing-mould)

project CommercialRetailHealthEducation

[![Tabcorp Head Office – Mechanical and fire installations](https://assets.precisecdn.com/cdn-cgi/image/width=480,height=300,fit=cover,quality=80,format=auto/tabcorp%20commercial.jpg)](/project/tabcorp-head-office)

### [Tabcorp Head Office – Mechanical and fire installations](/project/tabcorp-head-office)

project Commercial

[![Railway Meadowbank Central ](https://assets.precisecdn.com/cdn-cgi/image/width=480,height=300,fit=cover,quality=80,format=auto/Meadow-central.jpg)](/project/railway-meadowbank-central)

### [Railway Meadowbank Central](/project/railway-meadowbank-central)

project CommercialRetailMixed Use Development